|
sexta-feria - 24 de maio de 2013
|
|
29-04-13
Line 4 of the Rio de Janeiro Metro; a challenging projectWorks require a high degree of engineering know how, advanced technology in equipment, complex planning and logistics to take the rails of the city’s metro to... |
|
29-04-13
Urban mobility in Belo HorizonteWith nearly 2.5 million inhabitants and increasingly chaotic traffic, the city of Belo Horizonte (BH) is undergoing a radical change. The progress of eight works... |
|
|
25-03-13
Deceleration may be a sign of stabilityIn 2012, the Brazilian realty market suffered impacts triggered by the crisis in the world’s economies, reporting negative results. The sector is still cautious... |
25-03-13
Victory in the race against timeWith 65% of progress made, work on the Arena Corinthians addresses the challenge of tight deadlines through planning, well-structured logistics and large scale... |
![]() |
|
Desenvolvido e atualizado por Diagrama Marketing Editoral - Apoio editorial: Revista Grandes Construções. Reprodução apenas com permissão dos editores e com o devido crédito. |
|